The 2026 Expansion
New building.
Same standards.
In April 2026 Belfanti Machine Works moved into a dedicated 4,000 sq ft commercial facility in Beaverton, with room to grow. Same team on your parts.
Moving day
Thousands of pounds of iron, one careful move.
Heavy-haul trucks, a lowboy trailer, and a rigging crew moved every mill into the new building. Then we leveled, re-trammed, and got back to cutting parts.
01Trucks arriveHeavy-haul tractor on site at first light.
02Rigging gear inLowboy trailer and a heavy forklift staged at the curb.
03Mills loadedHaas mills strapped down for the short ride.
04Into the new bayEach machine rolled into place inside Suites B & C.
05ReassemblyChip conveyors, enclosures, and utilities reconnected.
06Back to cuttingLeveled, re-trammed, and fully operational in May.
What it means for you
More room to run.
Room to grow
Floor space to add machines and capacity as your programs scale.
Built around the work
A dedicated commercial shop with space planned around machining, inspection, and shipping.
Same team
The people quoting, programming, and inspecting your parts didn't change.
Same standards
±0.001" when it matters, 1–2 day quotes, and dates we actually hit.
Beaverton, OR 97006 Shipping and receiving: Suite C